Super high-rise steel structure Large span space steel structure Assembled steel structure
Hangzhou GTLAND Plaza
Project introduction:   the overall floorage of Hangzhou GTLAND Plaza is nearly 300000 square meters,with steel structure of nearly 8000 tons.
Shopping Center Phase 1 of Nanning Huarun Center
Project introduction: the overall floorage of Shopping Center Phase 1 of Nanning Huarun Center is 288343 square meters, with steel structure’s work amount of nearly 8000 tons.
Shenzhen Securities Exchange Operation Center
Project introduction: the overall floorage of Shenzhen Securities Exchange Operation Center is nearly 262400 square meters, with building altitude of nearly 245.8m, lifting annex of 37m, overhanging 36m form east to west, 22m from
Xiamen Jianfa International Building
Project introduction: the overall floorage of Jianfa International Building is nearly 178000 square meters, with building altitude of 219.4m, steel structure usage of nearly 11000 tons.
Shenzhen Branch Building of CMBC
Project introduction:    the overall floorage of Shenzhen Branch Building of CMBC is nearly 105845 square meters, with steel structure usage of about 5800 tons.
Zhanjiang Rongsheng Central Square
Project introduction:   the steel usage of Zhanjiang Rongsheng Central Square is nearly 2800 tons, with building altitude of about 97.65m.
Puning Jinsha International Hotel
Project introduction:   the steel st ructure usage of Puning Jinsha International Hotel is nearly 2000 tons, with building altitude of about 158m.
China Mobile Shenzhen Information Building
Project introduction:   the building altitude of China Mobile Shenzhen Information Building is nearly 180m, with steel structure usage of about 3000 tons.
Changsha Bofu International Plaza
Project introduction:   the building altitude of Changsha Bofu International Plaza is nearly 228m, with steel structure usage of about 3160 tons.